Source by room, then confirm the details by category.
Explore furniture, cabinetry, doors, windows, lighting, bathroom products and finishes, with the details to prepare and related sourcing projects.
Living & dining
Sofas, tables, chairs, storage, rugs and decorative lighting.
Bedrooms & wardrobes
Beds, bedside pieces, wardrobes and coordinated soft furnishings.
Kitchen & cabinetry
Cabinetry, hardware, stone surfaces and appliance-fit coordination.
Bathrooms
Vanities, sanitaryware, fittings, tiles and stone.
Doors, windows & finishes
Doors, windows, tiles, stone and other specified building materials.
Lighting & finishing touches
Decorative lighting, curtains, carpets and finishing pieces.
Source kitchen cabinets with the details agreed before production.
Prepare layouts, measurements, materials, hardware and appliance interfaces for kitchen cabinet sourcing in Foshan, with Kirin supplier and delivery coordination.
Turn storage needs into cabinet, hardware and installation details.
Define measurements, storage needs, doors, fittings and lighting for wardrobe sourcing in Foshan, with supplier coordination and agreed installation support.
Match bathroom products to the site, not just the style.
Vanities, tops, basins, taps and mirror lighting may come from different suppliers. Bring wall dimensions, plumbing, mounting conditions and usage requirements into one brief before ordering.
Cabinet and top
Record finished dimensions, door and drawer clearances, and basin-to-top compatibility.
Plumbing and mounting
The client supplies site conditions; the relevant production or installation party checks connections, fixing methods and maintenance access.
Materials and documentation
Specify material needs for the setting. Request testing or destination documents early; a material name is not a substitute for documentation.
For doors and windows, fit and interfaces matter as much as finish.
Within the same style, openings, handing, hardware, glazing and installation conditions may differ. Define these requirements to make supplier quotations comparable.
Openings and handing
Record openings, finished-surface information, handing and nearby obstructions; the relevant parties check and approve the production drawings.
Configuration and performance needs
Specify materials, hardware and performance documentation. The project’s qualified parties define applicable regulatory or engineering requirements before supplier matching.
Packing and installation
Link frames, panels, fittings and package identifiers to the drawings, with receiving and installation responsibilities defined.
Tell us where your home is, and what you need.
A destination, sourcing categories and preferred timing are enough to start. Send plans or images later through WhatsApp or email.
Discuss the brief first, then confirm scope, fees and team availability.